MENU

Weston Park Boiler Mechanical Upgrades

Weston Park Boiler Mechanical Upgrades

Location: 330-331 Blake Steet, Winnipeg, MB

Client: Manitoba Consumer Protection and Government

Duration: 13 Months

Date: August 2024

Contract Value: $1,000,000

Key scope: Boilers, Pumps, Valves, Electrical

Marketing scope:

Delivering high-performance infrastructure across five residential buildings (D, E, F, G & W), this project features a full-scale upgrade of mechanical and electrical systems — engineered for efficiency, reliability, and long-term value.

At the heart of the modernization is the installation of high-efficiency boilers and a new hydronic distribution system, tailored to meet the heating demands of each building. New in-line pumps, speed rotors, expansion valves, and mixing valves are being integrated to optimize system control and flow performance.

Supporting this mechanical transformation is a newly designed electrical system, purpose-built to power and protect all upgraded components with maximum efficiency.

Service Call Request

Affiliations

TimeDBMem
init0.004s20.0 B
partial: panel-full0.001s20.0 B
partial: nav-custom0.001s30.0 B
partial: footer0.008s190.0 B
template: project-single0.018s340.0 B
partial: header0.012s230.0 B
layout: default0.012s230.0 B
partial: snippet-ga0.000s20.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: admin-bar0.001s20.0 B
layout: _base0.003s70.0 B
   0.036s90 Queries2.0 MB
   0.036s90 Queries2.0 MB