
Location: 330-331 Blake Steet, Winnipeg, MB
Client: Manitoba Consumer Protection and Government
Duration: 13 Months
Date: August 2024
Contract Value: $1,000,000
Key scope: Boilers, Pumps, Valves, Electrical
Marketing scope:
Delivering high-performance infrastructure across five residential buildings (D, E, F, G & W), this project features a full-scale upgrade of mechanical and electrical systems — engineered for efficiency, reliability, and long-term value.
At the heart of the modernization is the installation of high-efficiency boilers and a new hydronic distribution system, tailored to meet the heating demands of each building. New in-line pumps, speed rotors, expansion valves, and mixing valves are being integrated to optimize system control and flow performance.
Supporting this mechanical transformation is a newly designed electrical system, purpose-built to power and protect all upgraded components with maximum efficiency.











| Time | DB | Mem | |
|---|---|---|---|
| init | 0.004s | 2 | 0.0 B |
| partial: panel-full | 0.001s | 2 | 0.0 B |
| partial: nav-custom | 0.001s | 3 | 0.0 B |
| partial: footer | 0.008s | 19 | 0.0 B |
| template: project-single | 0.018s | 34 | 0.0 B |
| partial: header | 0.012s | 23 | 0.0 B |
| layout: default | 0.012s | 23 | 0.0 B |
| partial: snippet-ga | 0.000s | 2 | 0.0 B |
| partial: responsive-menu-drawer | 0.000s | 0 | 0.0 B |
| partial: responsive-menu-drawer | 0.000s | 0 | 0.0 B |
| partial: admin-bar | 0.001s | 2 | 0.0 B |
| layout: _base | 0.003s | 7 | 0.0 B |
| ✖ ⇓ | 0.036s | 90 Queries | 2.0 MB |
| ✖ ⇑ | 0.036s | 90 Queries | 2.0 MB |