Location: 67 - 1st Street, The Pas, MB
Client: Northern Regional Health Authority
Duration: 12 Months
Date: April 2024
Contract Value: $1,000,000
Key scope: Drainage system, Pumps, Electrical, Controls, Civil
Marketing scope:
We’re elevating building infrastructure with a complete plumbing system upgrade designed for durability and long-term efficiency. This project includes the full replacement of the existing drainage system, along with the addition of new mezzanine-level sanitary lines to support expanded capacity.
New high-performance sump pumps, drain pumps, and gaskets are being installed, paired with upgraded drain piping to ensure smooth, reliable operation. Complementing these mechanical improvements are brand-new electrical panels and control systems for precise monitoring and control.
To support the enhanced drainage network, targeted civil work is underway to install new floor drains — providing effective water management and long-term system resilience.
This plumbing upgrade is a strategic investment in operational reliability, code compliance, and facility longevity.











| Time | DB | Mem | |
|---|---|---|---|
| init | 0.002s | 2 | 0.0 B |
| partial: panel-full | 0.001s | 2 | 0.0 B |
| partial: nav-custom | 0.002s | 3 | 0.0 B |
| partial: footer | 0.011s | 19 | 0.0 B |
| template: project-single | 0.019s | 34 | 0.0 B |
| partial: header | 0.014s | 23 | 0.0 B |
| layout: default | 0.014s | 23 | 0.0 B |
| partial: snippet-ga | 0.001s | 2 | 0.0 B |
| partial: responsive-menu-drawer | 0.000s | 0 | 0.0 B |
| partial: responsive-menu-drawer | 0.000s | 0 | 0.0 B |
| partial: admin-bar | 0.002s | 2 | 0.0 B |
| layout: _base | 0.004s | 7 | 0.0 B |
| ✖ ⇓ | 0.040s | 90 Queries | 2.0 MB |
| ✖ ⇑ | 0.040s | 90 Queries | 2.0 MB |