MENU

The Pas Health Complex Drainage Replacement

The Pas Health Complex Drainage Replacement

Location: 67 - 1st Street, The Pas, MB

Client: Northern Regional Health Authority

Duration: 12 Months

Date: April 2024

Contract Value: $1,000,000

Key scope: Drainage system, Pumps, Electrical, Controls, Civil

Marketing scope:

We’re elevating building infrastructure with a complete plumbing system upgrade designed for durability and long-term efficiency. This project includes the full replacement of the existing drainage system, along with the addition of new mezzanine-level sanitary lines to support expanded capacity.

New high-performance sump pumps, drain pumps, and gaskets are being installed, paired with upgraded drain piping to ensure smooth, reliable operation. Complementing these mechanical improvements are brand-new electrical panels and control systems for precise monitoring and control.

To support the enhanced drainage network, targeted civil work is underway to install new floor drains — providing effective water management and long-term system resilience.
This plumbing upgrade is a strategic investment in operational reliability, code compliance, and facility longevity.

Service Call Request

Affiliations

TimeDBMem
init0.002s20.0 B
partial: panel-full0.001s20.0 B
partial: nav-custom0.002s30.0 B
partial: footer0.011s190.0 B
template: project-single0.019s340.0 B
partial: header0.014s230.0 B
layout: default0.014s230.0 B
partial: snippet-ga0.001s20.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: admin-bar0.002s20.0 B
layout: _base0.004s70.0 B
   0.040s90 Queries2.0 MB
   0.040s90 Queries2.0 MB