MENU

Swan Valley School Boiler Replacement

Swan Valley School Boiler Replacement

Location: Swan River, MB

Client: Swan Valley School Division

Duration: 13 Months

Date: May 2023

Contract Value: $1,350,000

Key scope: Boilers, HWTs, Pumps, RTU, Electrical, Controls

Marketing scope:

We’re transforming building performance with a full mechanical overhaul designed for maximum efficiency and reliability. This upgrade begins with the removal of existing boilers, hot water tanks, hydronic pumps, and piping — making way for the installation of state-of-the-art high-efficiency boilers, a new hot water tank, and advanced pumping systems with precision control valves.

A new rooftop unit (RTU) and ductwork system are replacing outdated equipment, ensuring enhanced air distribution and climate control. Supporting these mechanical upgrades are all-new electrical systems, modern controls, and a fully updated fire alarm network.

In addition, a brand-new glycol system is being introduced, complete with energy-efficient pumps, variable frequency drives (VFDs), and professional-grade insulation — delivering long-term durability and performance.

Service Call Request

Affiliations

TimeDBMem
init0.001s20.0 B
partial: panel-full0.001s20.0 B
partial: nav-custom0.002s30.0 B
partial: footer0.010s190.0 B
template: project-single0.020s340.0 B
partial: header0.022s230.0 B
layout: default0.022s230.0 B
partial: snippet-ga0.001s20.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: admin-bar0.002s20.0 B
layout: _base0.005s70.0 B
   0.048s90 Queries2.0 MB
   0.048s90 Queries2.0 MB