
Location: Swan River, MB
Client: Swan Valley School Division
Duration: 13 Months
Date: May 2023
Contract Value: $1,350,000
Key scope: Boilers, HWTs, Pumps, RTU, Electrical, Controls
Marketing scope:
We’re transforming building performance with a full mechanical overhaul designed for maximum efficiency and reliability. This upgrade begins with the removal of existing boilers, hot water tanks, hydronic pumps, and piping — making way for the installation of state-of-the-art high-efficiency boilers, a new hot water tank, and advanced pumping systems with precision control valves.
A new rooftop unit (RTU) and ductwork system are replacing outdated equipment, ensuring enhanced air distribution and climate control. Supporting these mechanical upgrades are all-new electrical systems, modern controls, and a fully updated fire alarm network.
In addition, a brand-new glycol system is being introduced, complete with energy-efficient pumps, variable frequency drives (VFDs), and professional-grade insulation — delivering long-term durability and performance.











| Time | DB | Mem | |
|---|---|---|---|
| init | 0.001s | 2 | 0.0 B |
| partial: panel-full | 0.001s | 2 | 0.0 B |
| partial: nav-custom | 0.002s | 3 | 0.0 B |
| partial: footer | 0.010s | 19 | 0.0 B |
| template: project-single | 0.020s | 34 | 0.0 B |
| partial: header | 0.022s | 23 | 0.0 B |
| layout: default | 0.022s | 23 | 0.0 B |
| partial: snippet-ga | 0.001s | 2 | 0.0 B |
| partial: responsive-menu-drawer | 0.000s | 0 | 0.0 B |
| partial: responsive-menu-drawer | 0.000s | 0 | 0.0 B |
| partial: admin-bar | 0.002s | 2 | 0.0 B |
| layout: _base | 0.005s | 7 | 0.0 B |
| ✖ ⇓ | 0.048s | 90 Queries | 2.0 MB |
| ✖ ⇑ | 0.048s | 90 Queries | 2.0 MB |