MENU

AAFC Chilled Water Replacement

AAFC Chilled Water Replacement

Location: 101 Rte 100 #100, Morden, MB

Client: Manitoba Public Works & Government

Duration: 30 Months

Date: July 2024

Contract Value: $1,300,000

Key scope: Cooling Tower, Water Cooled Chiller, Electrical, FA

Marketing scope:

Delivering smarter performance and greater efficiency, this project features a major upgrade to the existing building mechanical system. At the core of this transformation is the installation of new water-cooled chillers, a centralized master controller, and a high-efficiency cooling tower — engineered to meet today’s demanding performance standards.

To support optimal system operation, we’ve integrated triple-duty valves and suction diffusers, enhancing flow control and system reliability. These upgrades are fully backed by a new electrical system, modernized fire alarm, and advanced building controls — ensuring seamless integration and long-term operational efficiency.

This comprehensive mechanical upgrade sets a new benchmark for intelligent infrastructure, energy savings, and year-round comfort.

Service Call Request

Affiliations

TimeDBMem
init0.002s20.0 B
partial: panel-full0.001s20.0 B
partial: nav-custom0.002s30.0 B
partial: footer0.011s190.0 B
template: project-single0.021s340.0 B
partial: header0.015s230.0 B
layout: default0.015s230.0 B
partial: snippet-ga0.001s20.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: responsive-menu-drawer0.000s00.0 B
partial: admin-bar0.002s20.0 B
layout: _base0.005s70.0 B
   0.043s90 Queries2.0 MB
   0.043s90 Queries2.0 MB